1. Contract between the owner and the contractor.
2. Overall cleaning of the building plot and removal of the top, soft layer of soil. Erection of fence to control the entrance to the construction site.
3. Excavation to the foundation level.
4. Placing of blinding concrete (5-10 cm thick).
5. Foundation formwork, placing of reinforcement for foundation and columns. Intalling lower part of column (To be cast into the foundation)
6. Placing of pipes and other fixtures for the hydraulic and sewage system.
7. Concrete placing to the foundation, specimen for testing concrete strength, and curing for at least 7 days according to standards.
8. Επιμελής συντήρηση του σκυροδέματος για 7 μέρες.
9. Reinforcement and formwork for columns. Concrete placing
10. Reinforcement and formwork for first slab. Placing of pipes for both the hydraulic and electrical system. Concrete placing
11. Επανάληψη των δύο τελευταίων βημάτων μέχρι το κτήριο να φτάσει στο τελικό του ύψος.
12. Κατασκευή εσωτερικών και εξωτερικών τοίχων.
13. Επιχρήσματα (σοβάτισμα τοίχων).
14. Ελάφροσκυρόδεμα για την κάλυψη των ηλεκτρολογικών και μηχανολογικών διασωληνώσεων.
15. Floor and bathroom tiles
16. Ηλεκτρικά, υδραυλικά και άλλα προσαρτήματα
17. Πόρτες και παράθυρα,
18. Ξυλουργικές Εργασίες
19. Μπογιατίσμα
20. Cleaning and handover.